1,500-Horsepower FMBT to Replace T-72 Tanks Beyond 2020

Category: Horse, Military, Weapons
Last Updated: 19 Jun 2021
Pages: 3 Views: 220

The Defence Research and Development Organisation (DRDO) is working on India's future main battle tank (FMBT) with a 1,500-horsepower (HP) indigenous engine. This tank will replace beyond 2020 the imported T-72 tanks, renamed Ajeya, with the Army. Various specifications for the FMBT have been finalised. “For engine development, we have formed a national team comprising members from the academia, the user, industry, and the DRDO. We have also gone in for an international consultant,” said S. Sundaresh, Chief Controller (Armaments and Combat Engineering), DRDO.

The first prototype of the indigenous engine would be ready in four to five years. The DRDO is launching a project to develop the transmission for the tank; the indigenous engine and transmission will together be called Bharat Power Pack and it will meet the FMBT's mobility requirements. “We are confident that we will be ready with the FMBT prototype in five to seven years,” Mr. Sundaresh said. “We are trying to involve all the stakeholders — the user [the Army], quality control personnel and the production agency — in this project and the industry will be our partner. We will go for a modular design so that we can always upgrade the tank when new technology comes in.

”The FMBT will weigh only 50 tonnes compared to Arjun-Mark II's 62 tonnes. The DRDO is simultaneously working on Arjun-Mark II. The volume occupied by the electronics package in the FMBT will be less. The FMBT's engine will be two-thirds the size of Arjun-Mark I's but will generate 1,500 HP compared to Arjun-Mark I's 1,400 HP. Improved technologies-Improvements in material, fuel injection, and filtration technologies will contribute to the reduction in the engine size without compromising on power. The immediate task for the CVRDE [Combat Vehicles Research and Development Establishment] is to develop the Arjun-Mk II tank and demonstrate it to the user and go for the production of 124 numbers in the HVF [Heavy Vehicles Factory],” Mr. Sundaresh said.

Order custom essay 1,500-Horsepower FMBT to Replace T-72 Tanks Beyond 2020 with free plagiarism report

feat icon 450+ experts on 30 subjects feat icon Starting from 3 hours delivery
Get Essay Help

The CVRDE and the HVF are situated in Avadi, near Chennai. The Arjun-Mk II tank will have a number of upgrades compared with Arjun-Mk I. Missiles can be fired from the former to destroy long-range targets and bring down attack helicopters. The tank's commander will have a panoramic sight with night vision. With this upgrade, the commander can carry out his hunting job at night with his thermal sight and engage targets more effectively,” Mr. Sundaresh explained. Another upgrade will see the introduction of an explosive reactive armor panel which will comprise explosives in metallic brick form.

These bricks will be mounted not only on the front slope of Arjun-Mk-II tank, but all round it as well. When the enemy ammunition hits these bricks, they will explode and retard the energy of the projectile, which then cannot penetrate the tank's armor. The penalty for using these bricks is that they will add 1. 5 tonnes to the tank's weight. But we can prevent top attack and side attack. We can add to the tank's protection from missiles and rocket-propelled grenades,” the DRDO Chief Controller said. Automatic target tracking -The fourth upgrade is that Arjun Mk-II will have an automatic target tracking system which will add to the accuracy when firing on a moving target.

P. Sivakumar, CVRDE Director, said Arjun-Mk-II would have a total of 93 upgrades, including the advanced air defense gun system for firing at attack helicopters. The Army had placed an indent for the production of 124 Arjun-Mk II tanks. In phase I, 45 tanks will roll out with 56 upgrades, including the missile firing capability and the commander's panoramic sight with night vision. In phase II, the remaining 79 tanks, with all the 93 improvements, will come off the assembly line. “By 2013-14, the first batch of around 30 tanks will go out,” Dr. Sivakumar said.

According to Mr. Sundaresh, these 124 Arjun-Mk II tanks would cost Rs. 5,000 crores.

Cite this Page

1,500-Horsepower FMBT to Replace T-72 Tanks Beyond 2020. (2018, Nov 30). Retrieved from https://phdessay.com/1500-horsepower-fmbt-to-replace-t-72-tanks-beyond-2020/

Don't let plagiarism ruin your grade

Run a free check or have your essay done for you

plagiarism ruin image

We use cookies to give you the best experience possible. By continuing we’ll assume you’re on board with our cookie policy

Save time and let our verified experts help you.

Hire writer